91. | Performance test report in triplicate issued by the Quality Inspection Department in the manufacturers |
| ⑦生产厂家质量检验部门签发的质量检验性能测试报告一式三份。 |
|
|
| |
92. | steam stimulation wells, high pressure plugging control and cleanup additive is developed based on lab test |
| 为解决稠油蒸汽吞吐井汽窜和注汽指进问题,利用室内实验,研制出高温调堵助排剂,对其性能进行了测试,结果表明可以进行现场试验。 |
|
|
| |
93. | But the opportunity of Performance Test for the Seller is limited to three times. |
| 但卖方进行性能测试的次数只限于三次。 |
|
|
| |
94. | shall be complete, clear and correct so as to meet the requirements of design, inspection, Erection, Test |
| 卖方保证所交付的技术文件完整、清晰、准确,并能满足合同项目的设 计、检验、安装、试车、投料试生产、性能测试、运行和维修的要求。 |
|
|
| |
95. | Test method of performance for crawler crane with lifting capacity up to 150 tons |
| GB/T13330-1991150t以下履带起重机性能试验方法 |
|
|
| |
96. | a test to display the performance of some new product. |
| 展示一个新产品性能的试验。 |
|
|
| |
97. | The Buyer shall organize and implement the performance test coordinated by the Seller and strictly follow |
| 买方应在卖方的配合下并严格按照本合同附件八中双方一致同意的生产线考核大纲组织并进行生产线考核。 |
|
|
| |
98. | In case all the guarantee indices specified in Appendix 3 are fulfilled in Performance Test |
| 如果在性能测试中所有项目实现了附件3所规定的保证数值 |
|
|
| |
99. | Test method of brake performance for motorcycles mopeds--Braking force |
| GB/T5382.2-1996摩托车和轻便摩托车制动性能试验方法制动力 |
|
|
| |
100. | Contract Plant has been achieved in the Commissioning, the two parties fix the starting date for the Performance |
| 如果合同项目在投料试生产中达到良好稳定运行,双方应确定性能测试的开始日期,性能测试的期间为__________ 天。 |
|
|
| |