|
61. | on the main functions and characteristics of some key test rigs such as diesel engine comperehensive performance |
| 重点介绍了柴油机综合性能试验台、车定置试验台、压器性能试验台以及燃油系统试验台的主要功能及特点。 |
|
|
| |
62. | Performance test for water treatment equipment--Ion exchange equipment |
| GB/T13922.2-1992水处理设备性能试验离子交换设备 |
|
|
| |
63. | Method of starting performance test for motorcycles and mopeds |
| 摩托车和轻便摩托车起动性能试验方法 |
|
|
| |
64. | The performance test will be based on the ISO10360 regulation. |
| 最终的验收将根据ISO10360测量机国际标准执行。 |
|
|
| |
65. | High speed performance test for motorcycle tyres-Drum method |
| GB/T13204-1991磨托车轮胎高速性能试验方法转鼓法 |
|
|
| |
66. | The parties shall be responsible for the performance test correspondingly to make contracted line Being |
| 买卖双方将各负其责,以保证生产线机组在验收考核开始前达到下列条件: |
|
|
| |
67. | " Alarm system power units, test methods and performance criteria" |
| GB/T15408-1994报警系统电源装置、测试方法和性能规范 |
|
|
| |
68. | Performance test methods for reciprocating internal combustion engine--Test methods |
| GB/T1105.2-1987内燃机台架性能试验方法试验方法 |
|
|
| |
69. | "Both Parties shall carry out the Erection, Test Runs, Commissioning, Performance Test and Acceptance |
| 双方将根据本合同附件十的规定实施本合同项目的安装、试车、投料试生产、性能测试和验收 |
|
|
| |
70. | High speed performance test for light truck tyres Drum method |
| GB/T7035-1993轻型载重汽车轮胎高速性能试验方法转鼓法 |
|
|
| |