|
31. | full use of motor energy and to keep high productivity and high efficiency, when the cutting motor power |
| 为了充分利用电动机能量和保证高产高效,电牵引采煤机截割电动机应经常在额定功率附近运转,因此对电动机功率需进行自动控制,减少电动机的过载或欠载。 |
|
|
| |
32. | No time should be lost in doing the preparatory work for energy projects, such as coal, power and oil |
| 煤、电、油这些能源项目,还有交通项目,前期工作要抓紧,晚了不行。 |
|
|
| |
33. | They intend to use their measurements to monitor pollution from a large coal-fired power plant planned |
| 他们期望通过毛发测定来监测该地区筹建的一个大型火电站的环境污染情况。 |
|
|
| |
34. | the late 1950's problems of emission control and waste disposal have sharply reduced the appeal of coal-fired |
| 从1960年以来,排放控制和垃圾处理的问题极大地削弱了燃煤电厂的魅力。 |
|
|
| |
35. | They were replaced with hot-water heat generated by a cleaner-burning coal-fired power plant located |
| 这些锅炉被一家位于这座城市郊外的更为洁净的热电厂驱动的水暖系统所取代。 |
|
-- 来源 -- 时文4 - P_shiwen_zhongguotiankongbianlan |
好评(10) |
差评() |
|
|
| |
36. | Similar works will be carried out on all oil-fired and coal-fired power plants with a capacity over125 |
| 所有发电量超过一亿二千五百万瓦的煤发电厂和石油发电厂均会于二零零七年前进行类似施工。 |
|
|
| |
37. | Ningxia Shizuishan Power Plant Project Phase I(4×300 MW), the first National2000- Year Demonstration Coal-fired |
| 宁夏石嘴山电厂一期工程,4×00MW机组,全国第一个“2000年燃煤示范电厂”项目,已投入生产运行。 |
|
|
| |
38. | Hydroelectricity, which will be the energy discharged by the project, causes much less pollution than coal-burning |
| 三峡工程利用水能发电,与燃煤电厂相比,可大量地减少污染物的排放。 |
|
|
| |
39. | Primary products are refined coking coal, high grade heating coal, coke, power supply and chemical products |
| 主要产品有炼焦精煤、优质动力煤、喷吹煤、焦炭及电力、煤化工产品、建材、煤矿机电设备等。 |
|
|
| |
40. | testing; Quality control surveillance for boiler and pressure vessel of power plant; Feasibility study of coal-field |
| 无损检测技术、站锅炉压力容器安全监督检验、力发电厂建设及改造工程的可行性研究。 |
|
|
| |