|
41. | Monopole unplanned outage times(MUOT) |
| 单极非计划停运次数 |
|
|
| |
42. | distributor breaker arm |
| 配电器断电臂 |
|
|
| |
43. | disconnecting protective panel |
| 断电保护屏 |
|
|
| |
44. | an outage lasting two hours |
| 两小时的停电 |
|
|
| |
45. | Phase controlled circuit Breaker |
| 断电相位控制器 |
|
|
| |
46. | Bipole planned outage times(BPOT) |
| 双极计划停运次数 |
|
|
| |
47. | An outage is a complete loss of voltage usually lasting from as short as 30 cycles up to several hours |
| 断电为完全失去电压,通常持续短至30个周波,长至数小时,甚至某些情况下达数天。 |
|
|
| |
48. | mean time between forced outage |
| 故障停用平均间隔时间 |
|
|
| |
49. | SIPO - Status Indication Process Outage |
| SIPO -- 进程超时的状态指示 |
|
|
| |
50. | Is there a water outage? |
| 停水了吗? |
|
|
| |