|
1. | four-way(tube) box |
| 十字接头,四通接头 |
|
|
| |
2. | measuring method for strength of mechanical fastenings for conveyer belts |
| 输送带机械接头强度的测定 |
|
|
| |
3. | Adhesives--Determination of tensile strength of butt joints |
| GB/T6329-1996胶粘剂对接接头拉伸强度的测定 |
|
|
| |
4. | Screwed Joint 1;Screwed Joint 2;Screwed Joint 3 |
| 螺纹接头 1;螺纹接头 2;螺纹接头 3 |
|
|
| |
5. | Results from the experiment show that the load bearing ability of the single-lap joint decreases as the length of the gap increase but the actual shear strength is increased in same time. |
| 结果表明,随着间隙长度的增加,接头的承载能力趋于减小,但接头的实际剪切强度却持续上升;当间隙长度继续增加时,接头的实际强度趋于下降。 |
|
|
| |
6. | analyzing adapter |
| 检验接头|分析接头 |
|
|
| |
7. | Conveyor belts-Determination of strength of mechanical fastening-Static test method |
| GB/T12736-1991输送带机械接头强度的测定静态试验方法 |
|
|
| |
8. | Screwed 1;Screwed 2;Screwed 3;Screwed 4 |
| 螺纹接头 1;螺纹接头 2;螺纹接头 3;螺纹接头 4 |
|
|
| |
9. | The high temperature strength of the joint increasedwith the increasing of brazing temperature. |
| 且在试验温度范围内,接头强度随钎焊温度升高呈上升趋势。 |
|
|
| |
10. | THE TCM CONNECTOR TO THE TRS CONNECTOR. |
| TCM接头到TRS接头 |
|
|
| |