|
1. | M.工程师:2+ years of CMM operation, analysis and maintenance experience. |
| 模具维修技师:具备丰富的汽车冲压模具维修经验。 |
|
|
| |
2. | 1.to dig out what is buried; to hollow out; to make (or undertake) excavation; to carry out excavation; to excavate 2.to unearth neglected talents |
| 挖掘 |
|
|
| |
3. | tunnel boring works |
| 隧道挖掘工程 |
|
|
| |
4. | The Project involves trench excavation, construction of cable trough, cable laying, backfilling and reinstatement works and landscaping works. |
| 工程包括坑道挖掘、兴建混凝土电缆槽、电缆铺设、回填和修复工程、和景观美化工程。 |
|
|
| |
5. | excavation plan |
| 挖掘工程计划 |
|
|
| |
6. | evacuation works |
| 挖掘工程 |
|
|
| |
7. | 1974就任于“利安工程公司”,任职工程部经理. |
| Project Manager-“ Lee On Construction Company”. |
|
|
| |
8. | Guofang Adiabatic Temperature Rise and Heat Conduction Equation of Concrete Based on Equivalent Time工程与科学中的计算力学 |
| 张子明,王弘.确定混凝土温度特性参数的遗传算法,工程与科学中的计算力学,中国计算力学大会论文集,2003年. |
|
|
| |
9. | excavation and footing |
| 挖掘及地脚工程 |
|
|
| |
10. | The act or process of excavating. |
| 挖掘挖掘的动作或过程 |
|
|
| |