|
11. | Safety effective of metal forepole support was analyzed in beam and bolting with wire mesh, problem and |
| 针对金属前探支护在架棚及锚网支护巷道中的安全作用进行了全面分析,提出了改进方案和存在问题,确保了金属前探支护的安全作用。 |
|
|
| |
12. | Combined with specific engineering, it introduces design and stress check calculation of high-support |
| 结合工程实例,介绍了转换层框支梁高支模的设计及受力验算,阐明了高支模设计是施工安全技术管理中控制的重点,以引起设计人员的重视,确保框支梁的施工安全和质量。 |
|
|
| |
|
|