|
1. | automatic switch with dual power supply are introduced and its application in continuous power supply area |
| 介绍了双电源自动转换开关的类型及特点,重点阐述了双电源自动转换开关在大中型水泥厂变配电站、控室、防应急系统等重要负荷在可靠连续供电方面的应用,以供有关人员借鉴。 |
|
|
| |
2. | The low voltage of the circuit limited the service area of a central station, and consequently this type |
| 低的线路电压限制了电站的供电范围,因此此类电站在大都市地区迅速蔓延。 |
|
|
| |
3. | WRS - Wide-area Rover Station |
| 广域流动站 |
|
|
| |
4. | Article35 The planning of any railway track, station, junction area and other related facilities within |
| 第三十五条在城市规划区范围内,铁路的线路、站、纽以及其他有关设施的规划,应当纳入所在城市的总体规划。 |
|
|
| |
5. | a sitting area in a Bus station. |
| 公共汽车站的座位区 |
|
|
| |
6. | Question 6: Is there any bigger river channel passing in the station area plot? |
| 地块内有比较大的河道通过?是否作改道规划? |
|
|
| |
7. | geological structure in the Yinchuan area, the earthquake azi-muth anomalies in the Lingwu-Wuzhong area |
| 结合区域地质构造资料,对银川台记录到的灵武、忠地区地震资料中出现的方位异常现象进行了探索性的分析。 |
|
|
| |
8. | WMS - Wide-area Master Station |
| 广域主控站 |
|
|
| |
9. | Question13:“ The06 road network and its adjustment in the station terminus area” file points out that |
| 问题13:电子文件“06枢纽地区路网及调整”中指出:枢纽站两侧道路提高级别,请问“两侧道路”是否指中兴路和圃田西路? |
|
|
| |
10. | On Establishing the Long - term Effective Administration Mechanism in the Area around Shanghai Railway |
| 谈建立铁路上海站地区的长效管理机制 |
|
|
| |