|
21. | Installation and mounting: Ceiling installation or supended to ceiling with chain or line. |
| 安装方式:吊装式或吸顶式,吊杆,吊链。 |
|
|
| |
22. | Lo-Lo carbulk carrier |
| 集装箱吊装、汽车和散货多用运输船 |
|
|
| |
23. | We bear all the charges up to the time the goods are on the hook . |
| 我们承担货物吊装上船之前的一切费用。 |
|
|
| |
24. | Assembly equipment and assembly method differs as span, weight and installation height of girder. |
| 钢梁的跨度、量和安装高度不同,适合的吊装机械和吊装方法亦随之而异。 |
|
|
| |
25. | Colligation point of girder should ensure stability of assembly, otherwise, temporary fixation should be carried out before assembly. |
| 钢梁的绑扎点要保证钢梁的吊装稳定性,否则就需在吊装前进行临时加固。 |
|
|
| |
26. | It's an important point to always keep in mind if a third party is providing the lighting rig. |
| 如果第三方提供灯光吊装的话,这点要牢记在心。 |
|
|
| |
27. | Review Contractors' HSSE procedures/ plans, such as heavy lifting operations and for high and complex structures. |
| 审核承包商的HSSE作业程序/划,如:大型吊装和超高、状复杂物体或主体结构吊装。 |
|
|
| |
28. | 85 The lifting work on site will be compelled to stop, owing to the strong wind.(a dense fog ). |
| 由于强风(浓雾),现场起重吊装工作将被迫停止。 |
|
|
| |
29. | We bear all the charges up to the time the goods is on the hook. |
| 我们承担货物吊装上船之前的一切费用。 |
|
|
| |
30. | The Virtual Simulation System of the Constructional Method of the Steel Structure Lifting Project in Shanghai Chia Tai Mall |
| 上海正大广场钢结构吊装施工方案虚拟仿真系统 |
|
|
| |